NWSC ๐บ๐ฌ engagement report
@nwscug - 170K followers on X
Measured over 9 original posts from a 30-day window, last computed on October 21, 2026.
Engagement
A typical post picks up 15 interactions against 170K followers, an engagement rate of 0.009%. Measured over 9 original posts, its engagement rate beats 22% of 20,444 tracked accounts of a similar size. That is a reason to look at how the audience behaves - reply depth, saves, whether the followers are recent - rather than a conclusion about it on its own. Posts are seen about 3.9K times each, and 0.387% of those impressions turn into an interaction. That is about 2.29% of the follower count, which is the gap between an audience on paper and an audience in a timeline. Posting runs at about 2.1 posts a day over the last 30 days, though only 17% of days saw any activity at all. Most posts go out around 09:00 UTC, and Sunday is the busiest day of the week. Of the 9 posts sampled, 100% carry an image or video. The account's strongest tracked post pulled 1.7K interactions, about 110x its own typical post. Recurring topics include #nwscbaraza, #tugendetukole, #waterman.
Measured over 9 original posts from a 30-day window, last computed on October 21, 2026. Recurring tags: #nwscbaraza, #tugendetukole, #waterman.
Compared with accounts its own size
NWSC ๐บ๐ฌ's engagement rate beats 22% of the tracked X accounts closest to it in follower count (20,444 accounts, accounts of similar size (decile 9 of 10)). A percentile is spread evenly by construction, so 50 really is the middle of that group and 90 really is its top tenth.
On engagement per impression rather than per follower it beats 22% of the same group. When those two numbers disagree, the gap is about how far its posts travel rather than how people react to them.
Where this sits in the catalog
At 0.009%, NWSC ๐บ๐ฌ sits above the 10th percentile of the 208,041 accounts in this comparison. That places it in the bottom 25% band, which runs below 0.025%.
Show the percentile table
| Percentile | Engagement rate |
|---|---|
| 10th percentile | 0.004% |
| 25th percentile | 0.025% |
| 50th percentile | 0.144% |
| 75th percentile | 0.683% |
| 90th percentile | 2.57% |
| 99th percentile | 82.6% |
This ruler is the whole measured catalog, not a size-matched group: it shows where the raw rate falls across every account we can measure, all of which are large. For a like-for-like comparison, read the size-band percentile above instead. See how the bands are built
Posting timing
This account posts most often around 09:00 UTC, and Sunday is its busiest day of the week. The bars below are the catalog-wide pattern, with this account's own busiest slot marked. They do not show how this account performs at each hour: we keep one aggregate per account, not one per hour, so that measurement does not exist in our data.
Show engagement by hour posted, utc as a table
| Hour (UTC) | Vs author median | Posts |
|---|---|---|
| 00:00 UTC | -1% | 89K |
| 01:00 UTC | -2% | 90K |
| 02:00 UTC | -3% | 88K |
| 03:00 UTC | -4% | 94K |
| 04:00 UTC | -5% | 76K |
| 05:00 UTC | -4% | 75K |
| 06:00 UTC | -5% | 86K |
| 07:00 UTC | -5% | 93K |
| 08:00 UTC | -4% | 108K |
| 09:00 UTC | -4% | 124K |
| 10:00 UTC | -3% | 129K |
| 11:00 UTC | -3% | 141K |
| 12:00 UTC | -3% | 154K |
| 13:00 UTC | -3% | 167K |
| 14:00 UTC | -4% | 173K |
| 15:00 UTC | -2% | 176K |
| 16:00 UTC | -3% | 171K |
| 17:00 UTC | -3% | 159K |
| 18:00 UTC | -2% | 149K |
| 19:00 UTC | -2% | 141K |
| 20:00 UTC | -1% | 131K |
| 21:00 UTC | 0% | 116K |
| 22:00 UTC | -2% | 100K |
| 23:00 UTC | -1% | 90K |
Show engagement by day of week as a table
| Day | Vs author median | Posts |
|---|---|---|
| Sunday | +5% | 393K |
| Monday | +1% | 483K |
| Tuesday | -2% | 520K |
| Wednesday | -3% | 472K |
| Thursday | -2% | 430K |
| Friday | -3% | 447K |
| Saturday | +2% | 393K |
Formats this account uses
Its own posting mix on the left, and what each of those formats does across every account we track on the right. Only formats where the effect clears our publish test appear here, so an empty row is a format we could not measure rather than one that does nothing.
| Format | This account | Catalog effect | 95% interval | Accounts behind it |
|---|---|---|---|---|
| Image or video | 100% of posts | +111% | +108% to +115% | 34K |
| Outbound link | 0% of posts | -41% | -42% to -40% | 32K |
| Typical length | - | +15% | +14% to +16% | 32K |
- 100% of this account's sampled posts carry an image or video. Across the catalog, posts with an image or video run 111% above the same accounts' other posts.
- 0% of its posts carry a link off X. Across the catalog, posts with an outbound link run 41% below the same accounts' other posts.
- Its average post runs 818 characters, which falls in the over 280 characters band. Across the catalog, posts over 280 characters run 15% above the same accounts' other posts.
These are catalog-wide differences applied to this account's own posting mix, not a measurement of how each format performs for this account specifically. We keep one median per account, not one per format per account, so the second thing is not something this data can tell you.
Best tweets
- Jul 30, 2023110x their median
Check out the colour of raw water that we abstract from Ggaba. Through a rigorous International drinking water standards process, we deliver the water to your tap clean and safe! Paying water bills helps us keep the taps flowing. For those avoiding bills, Mwagala tugoinge wa? https://t.co/QBQguu0jfv
- Sep 15, 20266.4x their median
Mbale water project hits 97% as testing and commissioning begin Mbale, Uganda The Government of Uganda @GovUganda , through the National Water and Sewerage Corporation is constructing the Mbale Water Supply and Sanitation Project. The Project has reached 97% physical completion following a two-day monitoring mission and monthly progress review. The exercise brought together the consultant, the contractor and NWSCโs project and Area teams to review progress and prepare for testing, commissioning and handover. The team inspected the NamatalaโBungokho pipeline, Musola Reservoir, Bungokho Water Treatment Plant and Manafwa Water Treatment Plant. Most components are substantially complete. The IUIU sewerage network, sewer rehabilitation, Busoba Reservoir, public sanitation facilities and distribution lines are all at 100%. Namatala Water Treatment Plant is at 98%, while Manafwa Water Treatment Plant stands at 93.3%. Remaining work is largely finishing, testing and snag closure. At Manafwa WTP, this includes pipe and pump testing, water-tightness tests and minor finishing works. Stakeholders agreed that a joint inspection should be carried out before final handover. Once commissioned, the project is expected to improve access to safe water and sanitation in Mbale and surrounding towns. #NwscUpdates @NWSCMD
- Sep 13, 20266.3x their median
Hoima Water Supply Improvement Project Takes Shape. The Government of Uganda @GovUganda , through NWSC, is constructing the Hoima Water Supply Project. This is part of the governmentโs strategic investment in critical infrastructure to support AFCON and the continued growth of the Albertine Region as Ugandaโs oil and gas hub. The project will draw water from the River Kafu in Kikuube District, treat it at a new conventional water treatment plant, and transmit it to Hoima City through a bulk water transfer system. It will deliver a treatment plant with capacity to produce 2 million litres of water daily, about 25 kilometres of transmission and distribution pipelines, and a 300-cubic-metre elevated steel reservoir at Musaijamukulu Hill, along with associated pumping, electrical and storage infrastructure. The Hoima 2 water supply project will augment the existing Hoima 1 system, which has served the city for many years but can no longer meet demand amid rapid urbanisation, population growth and rising industrial activity linked to the oil and gas sector. NWSC and the Government of Uganda are also finalising designs for the longer-term Hoima 3 Water Supply system, which would substantially expand water production, transmission and storage capacity. The two systems would eventually be integrated into a unified network for greater efficiency and resilience. @NWSCMD
- Sep 9, 20265.3x their median
The Government of Uganda is working to boost water supply reliability in the Kampala Metropolitan Service Area ONGOING: The Government of Uganda @GovUganda , through the National Water and Sewerage Corporation (NWSC), is constructing a 10-million-litre-capacity water reservoir on top of Kanyanya Hill. The reservoir is part of efforts to enable NWSC to evacuate more water from the Katosi Water Treatment Plant and subsequently improve water supply reliability in the following areas: Wakiso: Bugembegembe, Kayunga, Wakiso Town, Kasengeje, Gombe, Mende, Nkoowe, Kasa Ngombe, Sala, Sanda Kavumba, Mpunga, Wakiso Town Council, Namasanga, Buyera, Muyomba, Kikokiro, Kapeke, Kiwazi, Kisimbiri, Kabowa, Najjemba, Nakasuga, Namusera, Kyoga, Banda. Kakiri: Kikumbampa, Sebi, Kigaga, Kakiri Town, Mpegwe, Nakyelongosa, Kambe, Nadangira, Kitereede, Busujja, Nonve, Naguru, Buwanuka, Vugamira, Bukalango. Gayaza Branch: Kasangati TC, Bulumu, Kiwamulimu, Namavundu, Kayebe, Kyankima, Kitegomba, Gitta, Nabutaka, Nalusoga, Buwagga, Bukemba, Majijje, Wampewo. Nansana Branch: Wamala, Katooke A & B, Gganda Nasere, Nsumbi, Kawoko, Kabulengwa, Kireka Biira, Nakabugo, Kyebando, Kabumbi, Yesu Amala, Naluvule, Ssenge, Masiitowa, Mutuyanye, part of Nabweru, Kibwa. Kanyanya Branch: Kanyanya, Kyanja, Tula Road, Kakungulu, Mpererwe, Namasole, Mugalu, Mwaze. Luteete Branch: Namere Road, Katalemwa Estate, Komamboga, Kitala, Kanyanya Road, Kanyanya Hill, Kyanja, Nameere, Kiteezi, Lusanja, Masooli, Kitetika, Nangabo, Bamba, Bumbu, Kitagobwa, Nakanaku. Matugga Branch: Kiryagonja, Lwadda, Matugga, Buwuzzume, Kungu, Kito, Kirwanira, Lwadda B, Kabunza, Katalemwa, Wattuba, Namalele, Kikajjo Kabaga, Kiteezi, Nekyesanja, Kitagobwa, Lubatu, Kabaganda, Wabitembe, Kayanga, Jjokolera, Kiti, Mayirikiti, Katta, Mawule, Valley View and Green Estates, Jomayi, Kawanda, Kagoma, Kanyogoga, Kivuru, Nkojnkojeru, Mubende, Mabanda, Kisimu, Maganjo. @NWSCMD
- Sep 10, 20264.7x their median
Service Update-Emergency works along the Ggaba-Namasuba Bulk Transmission main have been completed Emergency works on the DN700 Ggaba-Namasuba main transmission main have been completed and water supply restored to parts of Kajjansi, Lweza, Katale, Seguku, Bunamwaya, Nalumunye, Lubowa, Kitiko, Najjanankumbi, Kabowa, Ndejje, Kigo, Serena, Bandwe, Birongo and the surrounding areas. We sincerely appreciate your patience and understanding during this downtime. #waterman @NWSCMD
- Sep 10, 20264.5x their median
Live Tomorrow: Water for All โ Opportunities and Challenges Dr. Eng. Silver Mugisha @NWSCMD , Managing Director of the National Water and Sewerage Corporation, joins Robert Kirabo on Good Morning Uganda. Weโll talk Water for All โ Opportunities and Challenges: access, infrastructure, and what it will take to get reliable water to every Ugandan. When: Friday 11 September 2026 Time: 9:00 AM Where:UBC TV | YouTube | X | Facebook โ @ubctvUganda Be part of the conversation. #NwscWorks
- Oct 18, 20264.4x their median
NWSC Completes Major Works at Awoja Plant, Boosting Daily Water Production Capacity to 10 Million Litres Soroti, Uganda โ Major improvement works at the Awoja Water Treatment Plant are nearing completion, with key infrastructure now operational and the plant positioned to increase water production from 7 million to 10 million litres per day. The project, implemented by the National Water and Sewerage Corporation (NWSC), aims to improve the reliability, adequacy and coverage of water supply across Soroti City and surrounding districts including Soroti, Kalaki, Kaberamaido and Amuria. Greater Gweri and other underserved communities are also set to benefit from expanded distribution networks. According to the latest progress update, substantial milestones have already been achieved. A second raw water pipeline measuring 700 metres of 14-inch pipe has been fully laid, with 65 out of 74 supporting pedestals cast. This is expected to strengthen the volume of raw water delivered to the plant. On the treatment side, three major new units are complete and fully operational: a 454.5 cubic metre clarifier, an 18 square metre rapid filter, and a 34.65 cubic metre flocculator. These have been successfully interconnected with the existing treatment network, marking a significant step toward the higher production target. At the raw water intake and pumping facilities, a new DN300 suction line has been installed, and all three high-lift pumps are in place. The installation of three new low-lift submersible pumps is expected to be completed by the end of October 2026. The 13.5-kilometre DN300 transmission main is fully laid, and the anchoring of both the DN300 transmission main and DN350 distribution line at Opiyai Rock has been completed, securing the pipelines along the rocky section. Distribution network expansion is also advancing to bring water closer to consumers. Completed or ongoing works include: - 5.3 km of 3-inch pipeline in Aukot Sub-county - 3 km of pipeline at Asukut Trading Centre, Awalwal Sub-county - 19 km of 6-inch main pipeline in Awalwal and surrounding areas - 5 km of 4-inch pipeline in Takaramiam - 4 km of 3-inch pipeline in Omugenya - 6 km of 2-inch pipeline serving Takaramiam and Damasco - 2.5 km of 1-inch pipeline in Damasco Remaining distribution works are targeted for completion by the end of the 2026/2027 financial year. Once fully commissioned, the combined interventions are expected to raise daily production by 3 million litres, strengthen supply reliability across the service area, reduce the distances communities travel to collect water, and support public health and socioeconomic development. The additional treatment capacity, upgraded pumping systems, strengthened transmission infrastructure and extended distribution network are designed to meet current demand while creating room for future growth in Soroti City and the wider region. @NWSCMD
- Sep 17, 20264.0x their median
Water Supply Update Dear Valued Customers, Please be informed that water supply to Kazinga, Namanve, Bweyogerere, Azam road, Kasubi, Kakajjo, Kirinya, Kireku, Ntebetebe, Wellspring, Bbuto, parts of Kiwanga, parts of Mbalwa, and the surrounding areas is currently interrupted to allow for pipe relocation works along Jinja road at Namanve Industrial park. Affected customers are advised to use the available water sparingly. We sincerely apologize for the inconvenience and request for your patience as we work to complete these works. #waterman
- Sep 5, 20263.8x their median
Uganda National Water and Sewerage Corporation, what is going on please? ๐ญ We need answers! ๐ฐ๐ญ @nwscug
- Sep 10, 20263.5x their median
The dry spell and rapidly rising demand in the Kampala Metropolitan Service Area, as well as in a few other areas of our operations, have taken a toll on our water supply systems. Subsequently, customers in our areas of operation, especially those on the periphery of our network, have experienced water supply challenges. We want to assure you that the Government of Uganda, through NWSC, is taking action and investing in new infrastructure across the Kampala water supply network. In Kampala, NWSC is implementing the Katosi Package 2B project, among other interventions, to stabilise water supply in the Kampala Metropolitan Service Area. We are working towards a more reliable water supply and easing these challenges, with a number of projects nearing completion. Water supply across the Greater Kampala Metropolitan Area will soon return to normal, with a more steady and reliable flow. We appreciate your patience and understanding as we work to improve water supply reliability.
Ranked by total interactions across everything we have tracked for this account, which is a longer history than the 30-day window the rates above use. The multiple compares each post to this account's own median.
Recurring topics
The most frequent hashtags in the sampled posts. They describe what this account writes about; they are not a performance signal, and the catalog-wide breakdown on the hub shows how little hashtag count moves.
Buy or sell Twitter (X) accounts - escrow-protected
PlayerSells is an escrow marketplace for Twitter (X) accounts. Every deal is protected, with no middleman risk.
Reading these numbers
A typical post picks up 15 interactions against 170K followers, an engagement rate of 0.009%. Measured over 9 original posts, its engagement rate beats 22% of 20,444 tracked accounts of a similar size. That is a reason to look at how the audience behaves - reply depth, saves, whether the followers are recent - rather than a conclusion about it on its own. Posts are seen about 3.9K times each, and 0.387% of those impressions turn into an interaction. That is about 2.29% of the follower count, which is the gap between an audience on paper and an audience in a timeline. Posting runs at about 2.1 posts a day over the last 30 days, though only 17% of days saw any activity at all. Most posts go out around 09:00 UTC, and Sunday is the busiest day of the week. Of the 9 posts sampled, 100% carry an image or video. The account's strongest tracked post pulled 1.7K interactions, about 110x its own typical post. Recurring topics include #nwscbaraza, #tugendetukole, #waterman.
- What is NWSC ๐บ๐ฌ's engagement rate on X?
- NWSC ๐บ๐ฌ (@nwscug) has an engagement rate of 0.009%, based on the median interactions across 9 original posts from the last 30 days against 169,654 followers. Replies, reposts and quote-posts of other people are excluded from that sample.
- Is that a good engagement rate?
- At 0.009%, NWSC ๐บ๐ฌ sits above the 10th percentile of the 208,041 accounts in this comparison. Those comparison accounts are all large ones, because our scanning cadence is weighted towards big accounts, so this is a ranking among peers of similar scale rather than a ranking across X.
- Does @nwscug have real engagement?
- Its engagement rate beats 22% of the tracked X accounts closest to it in follower count (20,444 accounts), which puts it in the bottom quarter for its size group. Ranking inside a size band matters because engagement rate falls as accounts grow, so a raw rate would mostly re-measure the follower count. It is a starting point for a look at follower quality, not a verdict on it.
- When does @nwscug post?
- Most posts go out around 09:00 UTC, and Sunday is its busiest day, at roughly 2.13 posts per day across the measured window.